We are adding a new first floor master bedroom suite to our home.
Here are a couple preliminary concept drawings ..
<click pictures to enlarge>
Floor Plan View
Doll House View
09-10-2010
The project is moving forward! We have selected a builder (Elite Construction) and start-up plans are being
assembled and approved before any actual construction begins. We anticipate starting the project in a few
weeks, and estimate that the builder will complete work about 6 weeks after that. I plan on doing all the finish
woodworking myself after the base structure is done.
Before (from Front)
Before (from Back)
09-27-2010
The project has started!! Steve and Wesley setup the strings and set the grade for the digging to begin,
and also notched out the deck to connect to the new wall.
9-28-2010
Trees are down!! Oak and maple tree bit the dust today
9-29-2010
Storing the foundation kit in the garage. Dig site marked. Ready for temporary driveway.
9-30-2010 and 10-01-2010
We had to build a temporary driveway to allow heavy machinery in without crossing our blacktop. We then
had the backhoe operator pickup my maple and oak logs and put them in Steve's trailer. I will have them
processed into lumber next week. The back yard was 'expanded' a bit and the black dirt scraped from the dig
site was spread back there. We dug the basement hole, but the next morning found a bit of water in the pit.
The basement dig was completed and rock was spread to help control the water. A lift pit was dug for
the eventual new basement bath and a temporary sump pump was put in it to drain the water from the pit.
10-04-2010
Footing forms installed ... ready for concrete tomorrow.
10-05-2010
Footings installed.
10-06-2010
Foundation form assembly begins. Just like a BIG Lego set!
10-07-2010
Foundation form almost ready for concrete tomorrow!!
10-08-2010
Foundation is poured and drying. Framing starts next week.
They first poured stone into the flooring area and around the outside perimeter for drainage.
Then they made 3 passes around the form with concrete, struck it off, and installed bolts.
10-11-2010
Sill gasket and plate installed. Bracing removed.
10-13-2010
Installing the drainage membrane. Installed the micro-lam beam and I-joists.
10-14-2010
Installing the sub-flooring.
10-18-2010
Framing up the walls!!

10-19-2010
Wall framing is complete, and a good start on the exterior sheathing.

10-21-2010
Trusses are installed!!

10-26-2010
Opening punched into new basement.

10-27-2010
New basement slab gets poured.

11-09-2010
Landscaping is done, including additional back yard lawn.

11-18-2010
Removing the temporary driveway.
11-19-2010
Roof is on and former living room windows have been re-installed in the addition.
11-30-2010
Front facade is completely finished. Looks like it was always there!!
12-06-2010
Drywall is all hung. Tape and mud processing starts tomorrow.
12-22-2010
Finally got the vanity out of my workshop (yay!!)
and installed.
Floor tile in bath and walk-in closet are down. Shower wall tile is
well
on its way to completion.
03-18-2011
Pics from the finished (well almost finished) project
Entrance to addition