New Addition Blog

We are adding a new first floor master bedroom suite to our home.

Here are a couple preliminary concept drawings .. <click pictures to enlarge>

New addition basic floor plan Floor Plan View        Doll house view Doll House View

09-10-2010

The project is moving forward! We have selected a builder (Elite Construction) and start-up plans are being

assembled and approved before any actual construction begins. We anticipate starting the project in a few

weeks, and estimate that the builder will complete work about 6 weeks after that. I plan on doing all the finish

woodworking myself after the base structure is done.

Before View from the Front  Before (from Front)         Before View from the Back   Before (from Back)

09-27-2010

The project has started!! Steve and Wesley setup the strings and set the grade for the digging to begin,

and also notched out the deck to connect to the new wall.

Building the string platforms    Notching the deck   String pattern

9-28-2010

Trees are down!! Oak and maple tree bit the dust today

     

9-29-2010

Storing the foundation kit in the garage. Dig site marked. Ready for temporary driveway.

   

9-30-2010 and 10-01-2010

We had to build a temporary driveway to allow heavy machinery in without crossing our blacktop. We then

had the backhoe operator pickup my maple and oak logs and put them in Steve's trailer. I will have them

processed into lumber next week. The back yard was 'expanded' a bit and the black dirt scraped from the dig

site was spread back there. We dug the basement hole, but the next morning found a bit of water in the pit.

The basement dig was completed and rock was spread to help control the water. A lift pit was dug for

the eventual new basement bath and a temporary sump pump was put in it to drain the water from the pit.

   

10-04-2010

Footing forms installed ... ready for concrete tomorrow.

   

10-05-2010

Footings installed.

   

10-06-2010

Foundation form assembly begins. Just like a BIG Lego set!

10-07-2010

Foundation form almost ready for concrete tomorrow!!

10-08-2010

Foundation is poured and drying. Framing starts next week.

They first poured stone into the flooring area and around the outside perimeter for drainage.

Then they made 3 passes around the form with concrete, struck it off, and installed bolts. 

10-11-2010

Sill gasket and plate installed. Bracing removed.

10-13-2010

Installing the drainage membrane. Installed the micro-lam beam and I-joists.

10-14-2010

Installing the sub-flooring.

10-18-2010

Framing up the walls!!

  

10-19-2010

Wall framing is complete, and a good start on the exterior sheathing.

10-21-2010

Trusses are installed!!

10-26-2010

Opening punched into new basement.

10-27-2010

New basement slab gets poured.

11-09-2010

Landscaping is done, including additional back yard lawn.

 

11-18-2010

Removing the temporary driveway.

11-19-2010

Roof is on and former living room windows have been re-installed in the addition.

11-30-2010

Front facade is completely finished. Looks like it was always there!!

12-06-2010

Drywall is all hung. Tape and mud processing starts tomorrow.

12-22-2010

Finally got the vanity out of my workshop (yay!!) and installed.
Floor tile in bath and walk-in closet are down. Shower wall tile is well
on its way to completion.

03-18-2011

Pics from the finished (well almost finished) project

  Entrance to addition

Bedroom

Master Bath

  Walk-in Closet / Laundry

  Basement

  Outside (Front and back)